FireAlarmGuy

AHJ Watch · Connecticut · Fairfield County

Greenwich fire alarm AHJ guide

Greenwich publishes a Fire Marshal plan-review fee and has a local Emergency Responder Communications Enhancement System (ERCES) policy that can materially affect new buildings and renovations.

Verified Aug. 21, 2026ERCES policy + plan-review fee

Quick reference

What is published

Fire Marshal Division
15 Havemeyer Place, Greenwich
Office phone
203-622-3950
Plan-review fee
$5 per $1,000 of total project construction cost under the posted Fire Marshal fee schedule.
Fire alarm / sprinkler review
Town ordinance materials state Fire Marshal review applies when fire alarm or sprinkler systems are proposed.
Local ERCES policy
Published policy applies to new building permit applications and renovations requiring permits, with listed building types/conditions including 3+ stories, underground areas, large commercial buildings over 5,000 sq ft, schools/assembly/critical infrastructure, or buildings with poor in-building radio coverage.

Field impact

What matters on a fire alarm project

  • Greenwich’s ERCES policy is a major preconstruction coordination item. Do not wait until fire alarm acceptance testing to determine whether in-building radio coverage work is required.
  • The posted Fire Marshal fee schedule states a $5 per $1,000 plan-review fee.
  • For projects with access, water-supply, fire-protection, or emergency-communications impacts, review current Fire Marshal conditions early in design.

Pre-submittal

Contractor checklist

  1. Confirm Fire Marshal plan-review fee based on current project construction cost.
  2. Determine early whether the Greenwich ERCES policy applies.
  3. Coordinate any required radio coverage testing/system design separately from the fire alarm scope.
  4. Submit fire alarm/sprinkler plans for Fire Marshal review where applicable.
  5. Confirm final Fire Marshal acceptance requirements before closeout.

Official sources

ERCES is not simply a fire alarm device requirement. It is a separate emergency-responder communications requirement that can affect design, testing, coordination, and project cost.

← Back to Connecticut AHJ directory