Special System Testing / Matrix Review
Select a matrix or acceptance testing topic to review inputs, outputs, signals, documentation, and restoration.
Sequence Matrix Review
Input/output matrix, initiating devices, emergency control functions, signal types, priorities, and AHJ expectations.
Input / Output Mapping
Monitor modules, relay modules, control points, device labels, point list review, and cause/effect mapping.
Emergency Control Functions
Fans, dampers, elevators, door release, smoke control, shutdown relays, and manual override verification.
Central Station Signal Verification
Alarm, supervisory, trouble, restore, point descriptions, account test status, and dispatch instructions.
AHJ Acceptance Test
Pretest, contractor coordination, AHJ walkthrough, issue tracking, retest items, and final acceptance.
Final Restoration / Documentation
Panel normal, bypass removal, monitoring restored, reports, as-builts, owner training, and closeout documentation.